A high-volume sediment dewatering initiative ensuring eco-friendly effluent discharge and restored hydroelectric storage capacity within a highly constrained mountainous footprint.
The Challenges Faced
Reservoir maintenance and desilting operations at hydroelectric dam sites present complex sediment management and environmental control challenges:
The Solution
To efficiently contain, dewater, and consolidate large volumes of dredged sediment within a compact layout, NovaTube NT125D geotextile tubes were deployed on-site.

The Result
Have a Similar Marine Project?
Consult with our geosynthetics engineers to design a custom turbidity control solution for your specific site conditions.
